This step is designed to ensure you are aware of the possible technical options available, their risks and benefits, and what you need to know for future-proofing the project.
We will work with you, utilising your expertise in the problem/project to build out your required technical knowledge with documentation for you to make an initial assessment of the best option/tech stack for your project.
Input
We need the information and background from you below. Most of these are expected ‘Output’ from our ‘Requirements Gathering Package’ and ‘Technical Assessment’. Information requested includes:
Refined Problem Statement with end-user validation
Audience Persona and Insights
Technical Requirements
Possible Feature list with prioritisation
Constraints and Limitations
Legal and policy constraints
Future considerations
Success Criteria
If you don't have all of these, we can run a kickoff workshop to fill in the gaps.
Output
You will be provided with a prototype that has been designed to deliver value for the key end-users. To get to this point, we will have worked closely with you, making decisions about what to include and focus on along the way, and looking to meet as many success criteria as possible. Expected output will include:
Links for working prototype
Testing plan for further end user testing that will include:
Objectives
Methodologies
Participant criteria
Metrics for success
You will also get a delivery report that will include
Documented the decisions made during the process
Feedback and Usability Report
Recommendations for improvement
Roadmap for Further Development
Value Assessment and ROI Analysis
Design collateral to give a clear guide for understanding how the prototype was built and how it is intended to be used. Such as:
Wireframes,
User flow diagrams,
Interface designs
User interaction models
Visual design
Time and Resource:
Duration: 1 Month - This package is designed to be delivered over one-month sprint cycles, following a kickoff workshop - subject to availability. It may be possible to extend or shorten the sprint cycle, at an additional cost. Cycles can be added as the project develops.
Our resource -A project manager will likely work with a minimum of four other roles during the delivery:
Solution Architect
Lead Developer
Designer
Engagement lead
Note: an individual may perform more than one role.
Your Resource - We need to have regular and open communication with your team. At a minimum, this should include:
Pre-Prototype Package workshop
Weekly sprint planning meetings with a contactable project lead during the delivery period.
Two meetings with the project sponsor or key decision maker during the delivery.
Project Debrief and retro
Cost: $7,680
Technical Assessment: Package 1
Get in Touch
If you have a new project or idea you want to prototype and/or build or want a second opinion on a project, please get in touch.
If you are in Wellington, we can grab a coffee, or we can easily connect online.
CONTACT
+64 (0)27 301 4196
hello@publicpurpose.co.nz
ADDRESS
Level 1, 7 Dixon Street,
Te Aro, Wellington,
New Zealand 6011